Hi everyone, everyone is back on deck and hard at work fitting out our home at 490 Grey Street. I thought I would give you an update on where things are at with our budget, progress on the fit out and the question I get asked most often – when will we be moving in?

Budget

Almost all of our pricing has been confirmed and we remain pretty much on budget. I say that with a little nervousness as we all know there are financial ‘surprises’ that sneak up on us during any construction. 

Thanks to those who have sponsored Chairs, Pews and Carpet. Here’s an update on sponsorship numbers as they currently stand,

If sponsorship is something you have been thinking about you can find out more and make a pledge by heading to the registrations page found here.

Fitout and Timeline

As noted in our earlier communications, we lost a couple of weeks due to required engineering amendments. Unfortunately, it’s unlikely that we will be able to recover this time. After meeting with our project and construction managers, we now expect completion toward the end of April.

Below you can read through the programme of works both completed and in progress.

COMPLETED:

  • Demolition and forming new openings completed

  • All structural steel engineering, fabrication and installation complete

  • Roof reinstalled

  • First floor infill complete with framing completed

  • Kitchen, toilet and external wall framing completed

  • In ground plumbing and drainage services completed

  • Lift shaft framing and floor rebate completed

PARTIALLY COMPLETED:

  • Sprinkler system 75% complete - with pump to be installed and droppers yet to be finished

  • Aircon – 15%

  • Auditorium Roof insulation 85% complete.

  • Electrical first fix - 50% completed

MAJOR ITEMS TO COMMENCE:

  • Ceiling installed in Auditorium

  • Framework for Theatre Seating

  • Lift installed

  • Lighting

  • Security system

  • Exterior Doors and windows

  • Glazing

  • Reinstate ceiling after sprinkler system installed

  • Timber joinery and bench tops

  • Audio Visual installation

  • Flooring

  • Remaining wall linings

  • Acoustic wall treatments

  • Tiling

  • Suspended ceilings

  • Mechanical

  • Interior doors

  • Painting

  • Final fix

  • Commissioning services